Training our future tradesmen

Get in Touch

We love to chat - call us on 4058 5200 or please use the contact form below and we will be in touch as soon as possible.
Contact Form

Surface Shutdown Maintenance Services

Year:
2012 - 2015
Client:
BHP Olympic Dam
Location:
Olympic Dam

Shutdown planning and execution including reliability, safety and engineering.


crosschevron-down