
MIWB Tank Pipework
The project included the assembly of 2 x 50ft diameter tanks and required pipework at the Mount Isa Water Board.
Year:
2020
Location:
Mount Isa Water Board
Client:
John Beever

Get in Touch
The project included the assembly of 2 x 50ft diameter tanks and required pipework at the Mount Isa Water Board.