
231 Flue & Walkway
Year:
2018
Client:
Glencore Mount Isa Mines
Location:
Mount Isa
The 3m diameter ducting ran was fabricated to replace ducting that runs between Lead Smelter Sinter Plant and the Stack Extraction Fan approximately 80m in length. We carried out the fabrication, trial assembly and delivery to the site and later carried out the installation.

