The demolition of the Old Incitec Shed included the demolition of the identified main shed and small shed including the removal of the slab, removal and disposal of existing metal sheeting, braces and posts, disposal of all collected timber and concrete waste and protection of the existing concrete slab by means of a sand / soil medium. All works were completed on time and within budget.

Fabrication of 600 tonne of steelwork for wharf expansion, permanent and temporary steelwork in mild and stainless, pile welding. Fabrication to 5131CC3.
View Project
Pipeline welding and mechanical package. 1500+ welds on lines from Behana intake to new Edmonton treatment plant. Above ground mechanical supply and installation package.
View Project
Spliced 100+ mild steel piles to MRTS68. All works undertaken in environmentally sensitive World Heritage areas.
View Project